Construction of a new Fertiliser Complex in Arzew (Algeria)

Project data:

construction period:    

2007 - 2011 

client:

ThyssenKrupp Uhde GmbH 

concrete capacity: ca. 93750 m³ 
steelwork capacity: ca. 17140 tons
   


 

Scpoe:


Ammonia plants I+II:

  • Structural analysis of all associated process units and pipe racks
  • Formwork and reinforcement drawings
  • Structural analysis for compressor tables
  • Dimensioning of steel connections for compressor house and pipe racks

Granulation and synthesis:

  • Checking of the calculations and reinforcement drawings of all process units plus pipe racks, water coolers and tank foundations
  • Dynamic analysis for machine foundations
 


Infrastructure:

  • Design and dimensioning of the road and dewatering system of the complete system
  • Design social building

Corridor and Jetty:

  • Structural analysis of foundations and supports of approximately 4km long feed pipe to the port (flat and deep founded)
  • Structural analysis for loading facilities on the existing jetty including justify inventory construction and their exercise