Reference object 2 // Norway >>
construction period: | 2008 - 2010 |
client: | Norsk Stein A/S (N) |
concrete capacity: | ca. 23.000 m³ |
precast concrete: | ca. 420 tunnel elements |
steel work capacity: | ca. 12.000 tons |
Stage I:
Stage II:
overview stone quarry Jelsa
Stone quarry, existing plant, crusher and screening building stage I und II, deposits and jetty.
Construction of the screening building (stage II)
Steel construction with concrete foundation plate and connected belt conveyors with single concrete foundations.
Construction of the dry sand (stage II)
Self-supporting hall as steel construction with on the rock founded single concrete foundations, in the background the crusher building and belt conveyors of the stage I
Construction of the wet sand, screening building and belt conveyors (stage II)
In the foreground the wet sand (single concrete foundations) and connected belt conveyors, in the back-ground the screening building