Reference object 1 // Germany >>

GelSab HDPE Bimodal

in Gelsenkirchen Scholven

Project data:
   construction period: 2006 – 2008
   client: Uhde GmbH
Scope:
  • Support structure planning LP 1 – 6
  • Construction of a complete plant area:
    • equipment foundation
    • column foundation
    • plant framework
    • pipe racks
    • slope pits
    • road construction
special features
Heavily loaded reinforced concrete and steel construction. For realizing a short construction period, the structural engineering has been created with a permanent coordination with the equipment engineering.
Execution of reinforced concrete components mainly as finished parts.
Installation conditions and sample loads decisive for the structural design. Structures in both ISBL and OSBL

ref1_1.png


GelSab HDPE Sabic Gelsenkirchen Scholven

New construction plant
(nightshot by Moritz Brilo)

ref1_2.png


GelSab HDPE Sabic Gelsenkirchen Scholven

New construction plant
(nightshot by Moritz Brilo)