Reference object 8 // Germany >>
contruction period: |
2011 - 2013 |
client: | Salzgitter Flachstahl GmbH |
concrete capacity: | ca. 1300 m³ |
steelwork capacity: | ca. 710 tons |
scope of service: |
support structure planning |
The construction project includes the loop accumulator, discharge of scrap and e-station extension of the tandem mill in the cold rolling mill.
The dimension of the accumulator is approximately 40 x 16 x 54 m.
The hall is founded on 71 concrete piles deep and consists of a clad with sandwich panels steel construction.
The Distribution Station is built over 2 floors and solid construction. The discharge of scrap consists of a flat steel structure founded.
Both components are also faced with sandwich panels.
Within he existing production facility involved extensive demolition and underpinning works for the construction of machine foundations.
Demolition work partly to 8 m below the hall floor.