Reference object 9 // Egypt >>

Ain Sukhna EHC Project

New Nitric Acid and Low Density Ammonium Nitrate Complex

Project data:
construction period:

2011 - 2013

client: ThyssenKrupp Uhde GmbH

concrete capacity:    

ca. 35297 m³

stellwork capacity: ca. 6570 tons

scope of service:

support structure planning
LP 2-5
object planning
LP 2-5


 

scope:
  • Structural analysis for all associated process units, warehouses, pipe racks, tanks and foundations
  • formwork and reinforcement drawings
  • steel construction layout drawings
  • dynamic analysis for compressors tables and machine foundations
  • workshop drawings including connection design
  • Design and dimensioning of the road and dewatering system of the complete plant. (infrastructure)
  • Design of substation including control building

special features:

Construction of a new nitric acid and low density ammonium nitrate complex including process units, ancillary facilities and transport units as well as a combined substation with control building.

The process units are connected via various pipe racks with each other, whose total length is more than 500 m.

The construction site of the new complex has a size of approximately 560 x 295 m.